The following represents the most commonly used standard details for water, sewer and storm water projects by the Boston Water and Sewer Commission. Other non-standard details are available upon request through the Engineering Department. The user should be aware BWSC updates its standard details on a regular basis.
Starting April 8 through April 19 from the hours of 9am-3pm. RJV Construction will be required to tie-in the sewer and drain on Clifford Street into the new sewer and drain installed in Blue Hill Ave. Traffic will be impacted. For more information the link.